KP Energy Ltd. logo

KP Energy Ltd. KP Energy

KP Energy Ltd. live price is ₹ 0.00. Price change 0.00, 0.00 percent.

₹ 0.00

0.00 (0.00)%

Ex-DatePurpose

25-06-2021

Audited Results

14-08-2021

Quarterly Results

31-08-2021

A.G.M.

29-10-2021

Quarterly Results & Interim Dividend

17-01-2022

Quarterly Results & Second Interim Dividend

30-05-2022

Audited Results & Final Dividend

12-08-2022

Quarterly Results & Interim Dividend

31-08-2022

A.G.M.

19-10-2022

Second Interim Dividend Quarterly Results

05-01-2023

Stock Split & Inter alia, to consider and approve the proposal for alteration in the capital of the Company by sub-division/split of existing equity shares of the Company having a face value of Rs. 10/- each fully paid up.

30-01-2023

Quarterly Results & Interim Dividend

19-05-2023

Quarterly Results & Audited Results

10-08-2023

Quarterly Results & Interim Dividend

29-08-2023

Employees Stock Option Plan & A.G.M.

07-11-2023

Interim Dividend & Quarterly Results

30-12-2023

Increase in Authorised Capital & Bonus issue Inter alia, to: 1. Consider the proposal for issue of bonus equity shares to the shareholders of the Company; 2. Consider and approve increase in authorized share capital of the company inter alia to accommodate issue of bonus equity shares, if any; 3. Consider and approve the appointment (regularisation) of Mr. Dukhabandhu Rath (DIN: 08965826) as Non-Executive Independent Director of the Company; 4. Consider and approve the appointment of Mr. Amitkumar Subhashchandra Khandelwal (DIN: 09287996) as Whole-time Director of the Company; 5. Any other matter with the permission of the Chairman.

13-02-2024

Quarterly Results

22-04-2024

Final Dividend & Audited Results

06-11-2024

Interim Dividend & Quarterly Results

06-02-2025

Interim Dividend & Quarterly Results

14-05-2025

Audited Results & Final Dividend

05-08-2025

Interim Dividend & Quarterly Results

07-11-2025

Quarterly Results & Interim Dividend

21-01-2026

Quarterly Results & Interim Dividend

07-05-2026

Final Dividend & Audited Results

11-08-2026

Quarterly Results

13-11-2026

Quarterly Results

News

19-NOV-2026

K.P. Energy informs about transcript of conference call

05:32 PM
13-NOV-2026

KP Energy reports Profit after tax of Rs 269.12 Mln, in the September 2026 quarter

02:32 PM
09-SEP-2026

KP Energy secures LoI from Emmvee Energy

The plant is proposed to be commissioned to meet the captive power requirements of Emmvee Energy’s manufacturing facilities in Karnataka

12:58 PM
12-AUG-2026

KP Energy - Quaterly Results

12:00 AM
11-AUG-2026

KP Energy informs about appointment of statutory auditors

04:35 PM
11-AUG-2026

K.P. Energy informs about investor presentation

03:16 PM
11-AUG-2026

KP Energy reports Profit after tax of Rs 259.52 Mln, in the June 2026 quarter

12:55 PM
03-AUG-2026

KP Energy surges on executing power purchase agreement with GUVNL

The PPA is for development of a Grid Connected Wind Power Project under IPP segment of the company, having a contracted capacity of 100 MW

09:40 AM
03-AUG-2026

KP Energy executes power purchase agreement with GUVNL

The PPA is for development of a Grid Connected Wind Power Project under IPP segment of the company, having a contracted capacity of 100 MW

09:29 AM
09-JUL-2026

KP Energy informs about compliances-certificate

01:22 PM
09-JUL-2026

KP Energy surges on commissioning 50.4 MW wind power project at Kutch, Gujarat

The company has developed this project for M/s. NTPC Renewable Energy

10:51 AM
09-JUL-2026

KP Energy commissions 50.4 MW wind power project at Kutch, Gujarat

The company has developed this project for M/s. NTPC Renewable Energy

10:38 AM
30-JUN-2026

K.P. Energy informs about trading window closure

04:50 PM
05-JUN-2026

K.P. Energy informs about analyst meet

11:21 AM
07-MAY-2026

KP Energy reports Profit after tax of Rs 779.81 Mln, in the March 2026 quarter

06:40 PM
04-MAY-2026

K.P. Energy informs about board meeting

12:30 PM
23-APR-2026

KP Energy soars on getting Inter-State Electricity Trading Licence from CERC

With this licence in place, the company will be able to access demand centres across multiple states, beyond region-specific offtake arrangements

11:21 AM
23-APR-2026

KP Energy gets Inter-State Electricity Trading Licence from CERC

With this licence in place, the company will be able to access demand centres across multiple states, beyond region-specific offtake arrangements

11:18 AM
23-APR-2026

KP Energy informs about press release

10:58 AM
27-MAR-2026

KP Energy bags LoA from JK Paper

The said award reflects the company’s established execution capabilities in delivering integrated wind-solar hybrid projects

03:16 PM
26-FEB-2026

KP Energy surges on bagging LoA from Enerparc Energy

The LoA is for the development of a 40.8 MW Wind-Solar Hybrid Power Project in Gujarat

09:55 AM
26-FEB-2026

KP Energy bags LoA from Enerparc Energy

The LoA is for the development of a 40.8 MW Wind-Solar Hybrid Power Project in Gujarat

09:39 AM
30-JAN-2026

KP Energy secures LoA from Inox Renewable Solutions

The company has secured LoA for development of 99 MW wind power project, on turnkey basis, located at Bhuj, Gujarat

06:11 PM
22-JAN-2026

KP Energy - Quaterly Results

12:00 AM
21-JAN-2026

K.P. Energy informs about outcome of board meeting

02:26 PM
21-JAN-2026

K.P. Energy informs about investor presentation

12:34 PM
21-JAN-2026

KP Energy reports Profit after tax of Rs 411.39 Mln, in the December 2025 quarter

10:58 AM
13-JAN-2026

KP Group enters into MoU with Government of Gujarat

The total proposed investment for these projects is approximately Rs 4,000 crore, with an estimated employment generation of over 4,000

10:42 AM
30-DEC-2025

K.P. Energy informs about closure of trading window

12:54 PM
19-NOV-2025

KP Energy shines on entering into MoU with Inox Wind

Under the MoU, KPE will undertake project development activities such as securing connectivity, land and right-of-way, obtaining statutory approvals, and executing Balance of Plant and EPC works

11:50 AM
19-NOV-2025

KP Energy, Inox Wind enter into MoU to jointly develop 2.5 GW of wind projects

Under the MoU, KPE will undertake project development activities such as securing connectivity, land and right-of-way, obtaining statutory approvals, and executing Balance of Plant and EPC works

11:38 AM
19-NOV-2025

K.P. Energy informs about press release

10:10 AM
10-NOV-2025

KP Energy informs about press release

11:37 AM
08-NOV-2025

KP Energy - Quaterly Results

12:00 AM
07-NOV-2025

K.P. Energy informs about investor presentation

04:33 PM
07-NOV-2025

K.P. Energy informs about unaudited financial results

04:29 PM
07-NOV-2025

KP Energy reports Profit after tax of Rs 353.08 Mln, in the September 2025 quarter

11:11 AM
03-SEP-2025

KP Group, AHES Co., GH2 Solar join hands to set up Green Ammonia facility in India

The partnership is formalized through a Memorandum of Understanding signed by KPI Green Hydrogen & Ammonia, a KP Group company, AHES Co., and GH2 Solar

02:12 PM
05-AUG-2025

K.P. Energy informs about outcome of board meeting

04:46 PM
05-AUG-2025

K.P. Energy informs about investor presentation

01:26 PM
05-AUG-2025

KP Energy - Quaterly Results

10:48 AM
05-AUG-2025

KP Energy - Quaterly Results

10:48 AM
05-AUG-2025

KP Energy reports Profit after tax of Rs 254.29 Mln, in the June 2025 quarter

10:48 AM
05-AUG-2025

KP Energy - Quaterly Results

10:48 AM
15-JUL-2025

K.P. Energy informs about confirmation certificate

12:50 PM
20-MAY-2025

KP Energy receives in-principle grant of connectivity from CTUIL for 100 MW Wind Power Project in Gujarat

The grant of this connectivity marks a significant milestone in the implementation of the company’s project

04:45 PM
14-MAY-2025

K.P. Energy informs about investor presentation

12:57 PM
14-MAY-2025

KP Energy informs about financial results

12:51 PM
14-MAY-2025

KP Energy - Quaterly Results

10:52 AM
14-MAY-2025

KP Energy - Quaterly Results

10:52 AM
14-MAY-2025

KP Energy reports Profit after tax of Rs 466.01 Mln, in the March 2025 quarter

10:52 AM
14-MAY-2025

KP Energy - Quaterly Results

10:52 AM
02-MAY-2025

KP Energy places order for Senvion India’s flagship 4.2M160 wind turbines

With a 160-meter rotor and hub heights up to 140 meters, the turbine is designed to maximise output while ensuring operational durability

09:59 AM
17-APR-2025

KP Energy commissions 23.1 MW wind-solar hybrid power project

The commissioned wind capacity consists of 11 WTGs of Suzlon make, model S120, each having a rated capacity of 2,100 kW and a hub height of 140 meters

03:08 PM
22-FEB-2025

KP Energy commissions 2.8 MW wind power project

With the present commissioning, the company’s total independent power producer capacity now stands at 48.5 MW

10:16 AM
22-FEB-2025

K.P. Energy informs about commissioning of wind power project

10:00 AM
06-FEB-2025

KP Energy hits upper limit on reporting around three-fold jump in Q3 consolidated net profit

Total consolidated income of the company increased by 155.19% at Rs 212.60 crore for Q3FY25

03:25 PM
06-FEB-2025

KP Energy reports around three-fold jump in Q3 consolidated net profit

Total consolidated income of the company increased by 155.19% at Rs 212.60 crore for Q3FY25

03:11 PM
06-FEB-2025

KP Energy - Quaterly Results

11:55 AM
06-FEB-2025

KP Energy reports Profit after tax of Rs 251.75 Mln, in the December 2024 quarter

11:55 AM
06-FEB-2025

KP Energy - Quaterly Results

11:55 AM
06-FEB-2025

KP Energy - Quaterly Results

11:55 AM
03-FEB-2025

KP Energy surges on commissioning 25.8 MW wind power project

Further, the development work for remaining 2.8 MW capacity is under progress and is expected to be commissioned within this month

09:55 AM
03-FEB-2025

KP Energy commissions 25.8 MW wind power project

Further, the development work for remaining 2.8 MW capacity is under progress and is expected to be commissioned within this month

09:45 AM
03-FEB-2025

K.P. Energy informs about board meeting

09:37 AM
18-JAN-2025

KP Energy commissions 6.3MW ISTS connected wind power project at Sidhpur site

With the present Phase-XI commissioning, the net cumulative capacity commissioned at Sidhpur site stands at 252MW

10:10 AM
30-NOV-2024

KP Energy informs about update on litigation

05:14 PM
06-NOV-2024

KP Energy - Quaterly Results

01:57 PM
06-NOV-2024

KP Energy - Quaterly Results

01:57 PM
06-NOV-2024

KP Energy - Quaterly Results

01:57 PM
06-NOV-2024

KP Energy reports Profit after tax of Rs 218.00 Mln, in the September 2024 quarter

01:57 PM
05-NOV-2024

KP Energy informs about award of order

04:14 PM
05-NOV-2024

KP Energy shines on bagging new orders of 1003.7 MW capacity

The company will be responsible for providing a range of services, including Engineering, Procurement, Construction, and Commissioning

02:20 PM
05-NOV-2024

KP Energy bags new orders of 1003.7 MW capacity

The company will be responsible for providing a range of services, including Engineering, Procurement, Construction, and Commissioning

11:43 AM
26-MAR-2024

KP Energy shines on commissioning further 16.8MW ISTS connected Wind Power Project

KP Energy is developing the Project for Apraava Energy as a Contractor under the Land and Balance of Plant Contract

11:36 AM
23-MAR-2024

KP Energy commissions further 16.8MW ISTS connected Wind Power Project

KP Energy is developing the Project for Apraava Energy as a Contractor under the Land and Balance of Plant Contract

04:48 PM
02-MAR-2024

KP Energy commissions further 29.4MW ISTS connected wind power project

The company is developing the project for Apraava Energy as a contractor under the Land and Balance of Plant Contract

05:06 PM
02-MAR-2024

K.P. Energy informs about updates

12:15 PM
28-FEB-2024

K.P. Energy informs about disclosure

03:25 PM
28-FEB-2024

KP Energy commissions further 25.2MW ISTS connected Wind Power Project

This Phase-VI commissioning is a part of the 250.8MW ISTS connected Wind Power Project capacity awarded to Apraava Energy by SECI

12:50 PM
13-FEB-2024

KP Energy - Quaterly Results

03:42 PM
13-FEB-2024

KP Energy - Quaterly Results

03:42 PM
13-FEB-2024

KP Energy - Quaterly Results

03:42 PM
13-FEB-2024

KP Energy reports Profit after tax of Rs 92.13 Mln, in the December 2023 quarter

03:42 PM
12-JAN-2024

K.P. Energy informs about certificate

05:07 PM
03-JAN-2024

KP Energy bags new order from ABREL EPC

The order is for development of Balance of Plant of 86.1MW wind capacity forming part of the wind-solar hybrid power project

12:25 PM
08-NOV-2023

K.P. Energy informs about press release

02:51 PM
07-NOV-2023

KP Energy - Quaterly Results

02:25 PM
07-NOV-2023

KP Energy reports Profit after tax of Rs 82.14 Mln, in the September 2023 quarter

02:25 PM
07-NOV-2023

KP Energy - Quaterly Results

02:25 PM
31-OCT-2023

KP Energy board to consider un-audited financial results

01:26 PM
12-OCT-2023

K.P. Energy informs about award of order

02:31 PM
12-OCT-2023

KP Energy surges on receiving new order from Aditya Birla Renewable Energy

The order is for development of Balance of Plant of 23.1MW wind capacity forming part of the wind-solar hybrid power project

02:04 PM
12-OCT-2023

KP Energy receives new order from Aditya Birla Renewable Energy

The order is for development of Balance of Plant of 23.1MW wind capacity forming part of the wind-solar hybrid power project

12:57 PM
29-SEP-2023

KP Energy jumps on getting NoA from NTPC Renewable Energy

The company will provide a comprehensive range of services, including Engineering, Procurement, Construction and Commissioning

10:13 AM
28-SEP-2023

KP Energy gets NoA from NTPC Renewable Energy

The company will provide a comprehensive range of services, including Engineering, Procurement, Construction and Commissioning (EPCC).

04:00 PM
28-SEP-2023

KP Energy surges on commissioning further 10.5 MW ISTS connected wind power project

KP Energy is developing the Project for Apraava Energy as a Contractor under the Land and Balance of Plant Contract

02:20 PM
28-SEP-2023

K.P. Energy commissions further 10.5MW ISTS connected wind power project

KP Energy is developing the Project for Apraava Energy as a Contractor under the Land and Balance of Plant Contract

10:37 AM
10-AUG-2023

KP Energy - Quaterly Results

04:17 PM
10-AUG-2023

KP Energy - Quaterly Results

04:17 PM
10-AUG-2023

KP Energy reports Profit after tax of Rs 150.37 Mln, in the June 2023 quarter

04:17 PM
11-JUL-2023

KP Energy surges after awarding order of 7 wind turbines to Suzlon Energy

A wind turbine supply order for a total of 47.60 MW has been placed by KP Group to Suzlon Energy

03:08 PM
11-JUL-2023

KP Energy awards order of 7 wind turbines to Suzlon Energy

A wind turbine supply order for a total of 47.60 MW has been placed by KP Group to Suzlon Energy

10:30 AM
07-JUN-2023

KP Energy charges 140MW power evacuation system for wind-solar hybrid power project in Gujarat

The power evacuation system comprised of 140MW hybrid Pooling Sub-station, 66kv Extra High Voltage Line and the 66kv bay at the Shelavadar Grid Sub-station

02:41 PM
07-JUN-2023

K.P. Energy informs about updates

11:39 AM
30-MAY-2023

KP Energy trades higher on the BSE

The company has successfully commissioned 25.2MW (Phase-III) ISTS connected wind power project

12:05 PM
29-MAY-2023

KP Energy gains on commissioning 25.2MW ISTS connected wind power project in Dwarka

With the present Phase-III commissioning the net cumulative capacity commissioned at Sidhpur site stands at 107.10MW

02:06 PM
29-MAY-2023

KP Energy commissions 25.2MW ISTS connected wind power project in Dwarka

With the present Phase-III commissioning the net cumulative capacity commissioned at Sidhpur site stands at 107.10MW

12:23 PM
19-MAY-2023

KP Energy - Quaterly Results

12:25 PM
19-MAY-2023

KP Energy reports Profit after tax of Rs 157.51 Mln, in the March 2023 quarter

12:25 PM
19-MAY-2023

KP Energy - Quaterly Results

12:25 PM
19-MAY-2023

KP Energy - Quaterly Results

12:25 PM
18-MAY-2023

KP Energy soars on installing 10MWdc solar power project

The project is located at village Simdhara, Taluka Jaghadia, District Bharuch, Gujarat

10:02 AM
17-MAY-2023

KP Energy installs 10MWdc solar power project

The project is located at village Simdhara, Taluka Jaghadia, District Bharuch, Gujarat

04:08 PM
08-MAY-2023

KP Energy commissions 29.4MW ISTS connected wind power project in Dwarka

This Phase-II commissioning is a part of the 250.8MW ISTS connected wind power project capacity awarded to Apraava by SECI

11:56 AM
08-MAY-2023

K.P. Energy informs about updates

11:14 AM
19-APR-2023

K.P. Energy informs about compliance certificate

04:23 PM
17-APR-2023

KP Energy recognized as ‘Company of the Year: EPC (Platinum)’ at India Wind Energy Forum Leadership Awards 2023

This recognition is a testament to the hard work and dedication of its team in providing top-notch EPC services in the renewable energy sector

04:00 PM
12-APR-2023

KP Energy charges 60MW hybrid power evacuation system at Bhungar site in Gujarat

The 60MW hybrid power project at Bhungar site is being developed by KP Energy inter alia for its captive customers under the Gujarat Hybrid Power policy, 2018

02:43 PM
12-APR-2023

KP Energy rises on commissioning 52.5 MW ISTS connected wind power project at Sidhpur Site

This is an essential step towards the successful implementation of the project

10:12 AM
11-APR-2023

KP Energy commissions 52.5 MW ISTS connected wind power project at Sidhpur Site

This is an essential step towards the successful implementation of the project

04:24 PM
30-JAN-2023

K.P Energy informs about outcome of board meeting

05:24 PM
30-JAN-2023

KP Energy reports Profit after tax of Rs 116.82 Mln, in the December 2022 quarter

03:36 PM
30-JAN-2023

KP Energy - Quaterly Results

03:36 PM
30-JAN-2023

KP Energy - Quaterly Results

03:36 PM
30-JAN-2023

KP Energy - Quaterly Results

03:36 PM
23-JAN-2023

K.P. Energy informs about board meeting

04:59 PM
05-JAN-2023

K.P. Energy informs about calendar of events for postal ballot process

04:39 PM
05-JAN-2023

K.P. Energy informs about outcome for board meeting

02:20 PM
21-DEC-2022

K.P. Energy informs about closure of trading window

12:13 PM
19-OCT-2022

KP Energy informs about outcome of board meeting

05:23 PM
19-OCT-2022

KP Energy - Quaterly Results

03:44 PM
19-OCT-2022

KP Energy - Quaterly Results

03:44 PM
19-OCT-2022

KP Energy - Quaterly Results

03:44 PM
19-OCT-2022

KP Energy reports Profit after tax of Rs 65.10 Mln, in the September 2022 quarter

03:44 PM
19-OCT-2022

KP Energy receives order for Erection and Installation of wind power project

KP Energy has started performing its scope of works and the Project is scheduled to be completed in Q3FY23

02:08 PM
22-SEP-2022

K.P. Energy informs about receipt of order

04:24 PM
22-SEP-2022

KP Energy zooms on bagging order for development of 8.1 MW Hybrid Power project

The project is scheduled for commissioning under the Gujarat Hybrid Power Policy, 2018

02:50 PM
22-SEP-2022

KP Energy bags order for development of 8.1 MW Hybrid Power project

The project is scheduled for commissioning under the Gujarat Hybrid Power Policy, 2018

02:42 PM
02-SEP-2022

KP Energy touches roof on aligning with Aditya Birla Group for development of wind power project

The total value of the projects to be developed by KP Energy for Aditya Birla Group is Rs 2,220 million

02:23 PM
02-SEP-2022

KP Energy aligns with Aditya Birla Group for development of wind power project

The total value of the projects to be developed by KP Energy for Aditya Birla Group is Rs 2,220 million (Rs 222 crore)

02:19 PM